BUILDTAKEOFF
HOME/CONCRETE/How Many Bags of Concrete for a 18×20 Slab?
2-Car Attached Garage • Verified Takeoff Spec
10% Standard Job-Site Safety Waste Included

How Many Bags of Concrete for a 18×20 Slab?

Direct Engineering Answer:

A 18×20 concrete slab poured at 4 inches thick requires ~4.89 cubic yards (or 221 eighty-pound bags / 294 sixty-pound bags) including 10% waste. Because this exceeds 2.5 yards, ordering ready-mix truck delivery (~0.5 loads) is typically 40% cheaper and saves hours of manual labor.

Primary Volume: 4.89 cu yd
80 lb Bags: 221 bags (80 lb)

Interactive Workstation & Complete BOM

Reset to Blank Hub →
BT-CONC-1048•Oct 15, 2026•Concrete Flatwork & Slabs

18x20 Slab Material Takeoff

01

Project Dimensions & Specs

Client-side reactive engine. Adjust parameters to recalculate quantities immediately.

ft
ft
in
Standard Thickness Presets:
Safety Waste Allowance:
02

Takeoff Schedule Summary

20×18×4"
ItemQuantityUnitEst. Cost
Ready-Mix (4000 PSI)4.89yd³$709
↳ Bag alternative22180-lb($1,437)
#4 Rebar Grid (12" OC)4420' sticks$638
Crushed Stone Base (4")6.85tons$240
10-Mil Vapor Barrier1roll(s)$135
Estimated Material Takeoff:$1,755 – $2,243
Subcontractor Flatwork Labor (~$1.35):~$2,369
Estimated Project TotalTurnkey materials + installation
$4,124 – $5,271
Interactive CAD Plan View
Scale: Dynamic Proportional
20 ft18 ft4" SLAB
#4 Rebar @ 12" O.C.
Crushed Base Incl.
Logistics: Ready-Mix (~0.5 truckload)
Advertisement • Sponsor
Complete Job-Site Bill of Materials (BOM)

Material Takeoff & Accessory Checklist

Click any unit price to customize for your local supplier costs.

Markup:
Sales Tax:
← Swipe to view all 6 columns →7 Line Items
Item / SpecificationCategoryQuantityUnit PriceTotal Est.Supplier / Order
Ready-Mix Concrete (4000 PSI)
Delivered via transit mixer truck, includes 10% safety overage
primary4.89 cu yd$782Local Supplier
#4 (1/2") Grade 60 Rebar (20 ft Sticks)
Grid reinforcement spaced 12" on-center both ways
accessory44 pieces (20')$638Home Depot
Rebar Tie Wire (Pack of 500 loop ties)
16-gauge bar ties for intersections + manual tie twister
fastener1 packs$20Amazon
Heavy Duty Rebar Chairs (2" - 3" height)
Maintains proper concrete cover above ground
accessory45 units$43Local Supplier
Crushed Stone Base (#57 or 3/4" Crusher Run)
4" compacted sub-base for drainage and stability
accessory6.85 tons$288Local Supplier
10-Mil Heavy Duty Polyethylene Vapor Barrier
10' x 100' roll, prevents capillary moisture ingress into slab
accessory1 rolls$135Home Depot
1/2" x 4" Foam Expansion Joint Strips
Perimeter expansion buffer for sidewalks, footings, and walls
accessory2 rolls (50')$44Local Supplier
Values update live with local price adjustments. Click unit prices to match your quotes.
Calculated Grand Total
$1,950
Engineering Methodology

Calculation Mechanics: Concrete Slab & Sub-Base

Formulas adhere to ASTM standards, ACI 318 guidelines, and standard construction estimating practice.

\ ext{Volume (cu yd)} = \ rac{\ ext{Length (ft)} \ imes \ ext{Width (ft)} \ imes \ rac{\ ext{Depth (in)}}{12}}{27} \ imes (1 + \ ext{Waste \%})

Step-by-Step Derivation Breakdown:

  1. 1Convert depth to feet: 4 inches ÷ 12 = 0.333 ft.
  2. 2Calculate raw slab volume: 20 ft × 18 ft × 0.333 ft = 120.00 cu ft.
  3. 3Convert to cubic yards: 120.00 ÷ 27 = 4.444 cu yds.
  4. 4Apply 10% safety allowance for uneven subgrade and form deflection: 4.89 cu yds total.
  5. 5Calculate 80-lb pre-mixed bags: 4.89 cu yd ÷ 0.0222 cu yd/bag = 221 bags.
  6. 6Calculate #4 rebar grid @ 12" on-center: 44 pieces (20ft rods) = ~880 linear feet.

Field Inspection & Trade Best Practices

  • For driveways and slabs taking vehicle loads, 4000 PSI concrete at 5" minimum thickness with #4 rebar is recommended over unreinforced 3.5" flatwork.
  • Pouring over a compacted 4" crushed gravel sub-base prevents slab settling, frost heave, and cracking.
  • Place control joints at intervals no greater than 2.5 to 3 times the slab thickness in feet (e.g., maximum 10-foot spacing for a 4" slab).
Verified Commercial Subcontractor Network

Need a Licensed Subcontractor to Build This?

Request competitive estimates from insured, pre-screened Concrete & Masonry trade contractors near your job site. Real quotes based on your exact calculated takeoff volume.

Free & No Obligation Licensed & Insured Rapid Dispatch Response
Verified trade network. Zero spam guarantee.
Concrete Takeoff
4.89 cu yd$1,755 - $2,243

Frequently Asked Questions for 18×20 Slabs

How many 80 lb bags do I need for a 18x20 slab?

You will need approximately 221 bags of 80 lb concrete mix. This accounts for a standard 10% waste and spillage buffer.

How many 60 lb bags for a 18x20 slab?

If using 60 lb bags, you will need approximately 294 bags. 1 cubic yard requires 60 bags of 60 lb mix.

How much rebar is needed for a 18x20 concrete slab?

With a standard #4 (1/2") rebar grid spaced 12 inches on center in both directions, you need approximately 44 sticks of 20-foot rebar and 399 tie points.

How much gravel base is required?

A recommended 4-inch crushed stone sub-base requires ~6.85 tons (4.89 cubic yards) of #57 gravel or crusher run.