HOME/AGGREGATE/How Much Gravel for a 14×30 Area?
RV Parking Pad (6-inch) • Bulk Tonnage Spec
15% Compaction Settling Buffer Factored

How Much Gravel for a 14×30 Area?

Direct Engineering Answer:

A 14×30 area at a depth of 6 inches requires 8.95 cubic yards of aggregate (~13.2 tons compacted). This is equal to approximately 1 standard 10-yard tri-axle dump truck load.

Volume: 8.95 cu yds
Tonnage: ~13.2 tons

Interactive Workstation & Complete BOM

Reset to Blank Hub →
BT-AGGR-4018•Oct 15, 2026•Gravel & Bulk Aggregate Takeoff

14x30 Driveway Aggregate Takeoff

01

Material Spec & Excavation Profile

Client-side reactive engine. Adjust parameters to recalculate quantities immediately.

ft
ft
in
Standard Application Depth Presets:
Compaction Settling Factor+15% extra
0% Loose15% Typical30% Roller
02

Takeoff Schedule Summary

30×14×6"
ItemQuantityUnitEst. Cost
Compacted Volume8.95yd³$403
↳ Loose quarry measure7.78yd³(settles 15%)
Hauling Weight (Wet)13.2tons~12.08 dry
Tri-Axle Truckloads1trip(s)$125
Geotextile Underlayment483sq ft$72
Estimated Material Takeoff:$547 – $699
Excavation & Subgrade Grading:~$629
Estimated Turnkey Project Cost:
$1,176–$1,503
Cross-Section Trench / Base Profile
Compacted Depth: 6"
COMPACTED SUBGRADE NATIVE SOIL6"30' L × 14' W Surface Coverage
CRUSHED STONE Base Course
Includes 10% Compaction Allowance
Advertisement • Sponsor
Complete Job-Site Bill of Materials (BOM)

Material Takeoff & Accessory Checklist

Click any unit price to customize for your local supplier costs.

Markup:
Sales Tax:
← Swipe to view all 6 columns →4 Line Items
Item / SpecificationCategoryQuantityUnit PriceTotal Est.Supplier / Order
#57 Crushed Clean Stone (3/4")
Bulk delivery, compacted depth of 6" over 420 sq ft (includes 15% compaction factor)
primary8.95 cu yds$430Local Supplier
Heavy-Duty Non-Woven Geotextile Driveway Underlayment (4ft x 100ft)
Separates sub-grade soil from aggregate, prevents rutting and weed growth
accessory1 rolls (400 sq ft)$68Home Depot
6" Steel Landscape Staples / Anchor Pins (Box of 200)
For pinning fabric to soil before aggregate placement
fastener1 boxes (200 pcs)$25Amazon
Bulk Dump Truck Hauling & Delivery (1 trip)
Standard local quarry/supplier drop fee (within 15-20 mile radius)
accessory1 trips$85Local Supplier
Values update live with local price adjustments. Click unit prices to match your quotes.
Calculated Grand Total
$608
Engineering Methodology

Calculation Mechanics: Aggregate & Tonnage

Formulas adhere to ASTM standards, ACI 318 guidelines, and standard construction estimating practice.

Volume (cu yd) = [(Length × Width × (Depth ÷ 12)) ÷ 27] × (1 + Compaction %) | Tons = (Yards × Density) ÷ 2000

Step-by-Step Derivation Breakdown:

  1. 1Surface area: 30 ft × 14 ft = 420 square feet.
  2. 2Raw cubic feet: 420 sq ft × 0.500 ft = 210.00 cu ft.
  3. 3Divide by 27: 210.00 ÷ 27 = 7.78 loose cubic yards.
  4. 4Apply 15% compaction settling factor = 8.95 compacted cubic yards.
  5. 5Calculate tonnage based on 2700 lbs/yd³ density: (8.95 × 2700) ÷ 2,000 lbs = 13.2 tons.
  6. 6Dump truck trips: Tri-axle dump trucks can legally haul ~10-12 yards or 15 tons max per highway axle weight limits = 1 load(s).

Field Inspection & Trade Best Practices

  • Subgrade preparation: Excavate topsoil down to solid subsoil clay/rock before placing base aggregate.
  • Geotextile fabric: Never skip geotextile underlayment on driveways or heavy parking; stone will migrate downward without it.
  • Lifts and tamping: Place crusher run in maximum 3-inch to 4-inch lifts and compact each lift with a vibratory roller.
Verified Commercial Subcontractor Network

Need a Licensed Subcontractor to Build This?

Request competitive estimates from insured, pre-screened Excavation & Gravel Driveway trade contractors near your job site. Real quotes based on your exact calculated takeoff volume.

Free & No Obligation Licensed & Insured Rapid Dispatch Response
Verified trade network. Zero spam guarantee.
Gravel & Aggregate Takeoff
8.95 cu yd$547 - $699

Frequently Asked Questions for 14×30 Areas

How many tons of gravel are in a cubic yard?

Crushed stone and gravel typically weigh between 2,700 and 2,950 lbs per cubic yard, which converts to approximately 1.35 to 1.48 tons per cubic yard.

Why do I need a compaction factor?

Loose gravel settles and locks together when rolled or driven on by heavy vehicles. Adding 15% to 20% ensures your finished gravel depth meets grade after compaction.

Do I need geotextile fabric under the gravel?

Yes, installing a non-woven geotextile underlayment fabric prevents crushed rock from sinking into the subsoil mud and blocks persistent weed growth.